Leichhardt Salt Pty Ltd is proposing to develop a solar salt project in the Cape Preston East area, approximately 55 km southwest of Karratha in WA. The Proposal will utilise seawater and evaporation to produce a concentrated salt product for export.
Leichhardt Salt Pty Ltd has prepared the Environmental Review Document in accordance with Environmental Protection Authority (EPA) procedures and is released for public review. The Environmental Review Document describes the Proposal, the likely environmental impacts and the proposed management measures.
The Environment Review Document and supporting appendices can be found for review below.
Environment Review Document
Hard copies of the document may be purchased for $10 (including postage) from:
Preston Consulting
Level 1, 226 Adelaide Terrace, Perth WA 6000
0488 737 273
Copies of the document may also be downloaded from www.epa.wa.gov.au or www.leic.com.au.
Copies of the document will be available for examination at:
-
- The State Library of Western Australia;
- Karratha Public Library; and
- Dampier Public Library.
The closing date for public submissions is: 14 August 2025.
The EPA prefers submissions to be made electronically via the EPA’s Consultation Hub at https://consultation.epa.wa.gov.au.
Alternatively, submissions can be posted to:
Chair, Environmental Protection Authority
Locked Bag 10
Joondalup DC, WA 6919
or delivered to:
The Environmental Protection Authority
Prime House, 8 Davidson Terrace
Joondalup, Western Australia 6027
If you have any questions on how to make a submission, please contact EPA Services, Department of Water and Environmental Regulation on 6364 7000.